The Robust Details website uses cookies to give you the best possible experience on our website.

By continuing to browse our website or by closing this message, you accept our use of cookies.

For more details about cookies please see our Privacy Policy.

TIMBER FRAME COMBINATIONS

SEPARATING
WALLS
SEPARATING FLOORS
E-FT-1
E-FT-2
E-FT-4
E-FT-5
E-FT-7
E-FT-8
E-FT-3
E-FT-6
E-FC-2 E-FS-1
E-WT-1 W 1 W 1
E-WT-2 W 1 W 1
E-WT-3 F F W 1 W 1
E-WT-4 F F W 1 W 1

 

KEY
F Only the separating floor requires pre-completion sound testing
W Only the separating wall requires pre-completion sound testing.
1 Lightweight steel and timber frame walls may be constructed above in-situ poured concrete floors. The lightweight walls built directly off the concrete floors may be registered as robustdetails® provided:
  • they meet all other requirements of the robustdetails®, including flanking constructions
  • the principles of the raft foundation junction are followed. As such, the concrete of the floor must have a mass of 365 kg/m2 (min), and a floating floor treatment must be provided.
Walls constructed to the soffit of in-situ poured concrete floors can not be registered as robust details™ and may be subject to pre-completion sound testing.

Decibel Ratings
E-xx-nn Building Regs
  Invalid Combination
Building Regs Combination

SIGN IN / SIGN UP
To download the online Handbook